Boguchany Dam, Hydroelectric power station in Kodinsk, Russia
Boguchany Dam is a hydroelectric facility spanning approximately 2.7 kilometers across the Angara River in Siberia. The complex houses nine large turbines designed to convert water flow into electrical power.
Construction started in the 1970s but was later halted and only completed in 2015. The extended timeline reflects the challenges of building in this remote location.
The facility represents a milestone in Russian engineering, demonstrating the nation's capabilities in developing large-scale energy infrastructure within remote Siberian territories.
The site sits in a remote Siberian region, making car or air travel the most practical approach. Visitors should prepare for cold weather and allow extra travel time to reach this area.
One of the turbines required a remarkable logistical feat to reach the site. A large rotor wheel was transported thousands of kilometers via river routes, illustrating the challenges of building in this region.
The community of curious travelers
AroundUs brings together thousands of curated places, local tips, and hidden gems, enriched daily by 60,000 contributors worldwide.