Mainbrücke Bettingen, Autobahnbrücke in Deutschland
The Mainbrücke Bettingen is a prestressed concrete road bridge in Wertheim that spans the Main River and connects two sections of town. The roughly 310 meter long structure has a simple, functional design with wide lanes and solid concrete supports that carry the weight of daily car and truck traffic.
The bridge was completed in the early 1960s and was noted at the time for having the longest spans of any prestressed concrete bridge built in Germany. It played a key role in improving transportation links in the region and has been maintained ever since.
The bridge takes its name from the Main River it crosses and has become woven into the daily routines of local residents and commuters. It serves as a practical connection between different parts of the region that people rely on without thinking much about it.
The bridge is accessible to pedestrians and cyclists but is primarily used for vehicle traffic. Visitors should be careful when crossing on foot as traffic is heavy and space for walkers is limited.
The bridge was built using a special hollow box technique where large prefabricated concrete sections were constructed on land and then lifted into place. This construction method achieved strength while using less material and was innovative for its time.
The community of curious travelers
AroundUs brings together thousands of curated places, local tips, and hidden gems, enriched daily by 60,000 contributors worldwide.