Alto Rabagão Dam, Hydroelectric power station in Vila Real, Portugal
Alto Rabagão is a concrete dam on the Rabagão River in Montalegre, Vila Real District, completed in 1964. It is 94 m tall and 1,970 m long along its crest, combining an arch dam in the centre with gravity dams on both sides. Its crest sits at 880 m altitude, and the reservoir covers 22.12 km².
The project began in the 1950s as part of modernizing Portuguese energy infrastructure. Its completion marked a major advance in the country's hydroelectric power development.
The dam is part of the water management system in this mountainous area and shows how the region harnesses water resources for energy production. The structure shapes the landscape today and stands as an important infrastructure landmark for the local area.
The dam lies on the Rabagão River inside Peneda-Gerês National Park, in the municipality of Montalegre. The crest stands at an altitude of 880 m and can be reached by road; the underground powerhouse is downstream. The reservoir's minimum operating level is 829 m, so the drawdown zone is visible at low water.
The dam's non-conventional design, made necessary by the site and guided by the French expert Andre Coyne, was checked by engineer Antonio Correia de Sousa with an IBM-Belgium team. It was the first time numerical simulations were used to design a dam.