Represa de Jurumirim, Hydroelectric power station in Cerqueira César, Brazil.
The Jurumirim dam spans across the Paranapanema River and creates a large reservoir behind it. The structure holds back water that spreads across the landscape, altering the natural flow of the river valley.
Construction began in the 1950s and marked a turning point in Brazil's energy strategy. This project was part of a major expansion wave of hydroelectric facilities across the country.
The name comes from the Tupi indigenous language and reflects the region's native heritage. Local communities have long been connected to the river valley and its resources.
The site is accessible by road and offers viewpoints of the dam structure. Keep in mind that this is an active industrial facility, so access to certain areas may be restricted for safety reasons.
The reservoir behind this dam is one of the largest freshwater storage areas in southern Brazil. Despite its size, the facility remains relatively overlooked by travelers in the region.
The community of curious travelers
AroundUs brings together thousands of curated places, local tips, and hidden gems, enriched daily by 60,000 contributors worldwide.