Palmar Dam, Hydroelectric power station at Rio Negro, Uruguay
Palmar Dam stretches across 2080 meters of the Rio Negro and produces electrical power through its turbine system. The structure serves as a passage connecting different regions on both sides of the river.
Construction began in the 1970s with Brazilian financing and was completed in 1982. This project played an important role in strengthening the nation's energy infrastructure.
The town of Palmar grew as a community around this project, originally established to house workers during construction. You can still see how daily life there developed in connection with this facility.
The facility can be reached by road that runs across the structure, connecting vehicles between both banks. You can explore the surrounding area and find viewing spots along the dam itself.
The dam performs a dual role by generating power while also serving as a roadway between two regions. This combination of energy production and transportation infrastructure is an example of practical engineering.
The community of curious travelers
AroundUs brings together thousands of curated places, local tips, and hidden gems, enriched daily by 60,000 contributors worldwide.