Charles-George Reclamation Trust Landfill, Superfund landfill site in Tyngsborough, Massachusetts
The Charles-George Reclamation Trust Landfill is a former waste facility occupying about 19 acres of land near Flint Pond Marsh and Dunstable Brook. It sits roughly 1 mile south of Tyngsborough's town center and is now marked by engineering controls and ongoing environmental monitoring systems.
The site began as a small municipal dump in the 1950s and expanded to accept industrial and chemical waste materials over time. Operations ceased in 1983, after which the property entered a long phase of remediation and environmental oversight.
The site's name reflects the families who shaped waste management in the region during its operational years. Today you can observe how local residents and agencies work together to monitor environmental conditions at the location.
The site is not open to casual public visits because active management and monitoring remain in effect. For information, contact the EPA or local authorities, which publish regular updates on safety conditions and environmental status.
The formerly contaminated property now hosts a 2.6-megawatt solar farm that has fed electricity into the local grid since 2017. The transformation demonstrates how old industrial sites can become sources of renewable energy production.
The community of curious travelers
AroundUs brings together thousands of curated places, local tips, and hidden gems, enriched daily by 60,000 contributors worldwide.