Seattle Civic Square, Architectural complex at 3rd Avenue and Cherry Street, Seattle, US
Seattle Civic Square is a mixed-use development combining residential, office, and retail spaces at a major downtown intersection. The complex includes a tall tower and an open public plaza that connects the site to surrounding pedestrian pathways.
The site at 3rd Avenue and Cherry Street was occupied by the Public Safety Building, demolished in 2005. A 43-story tower called Seattle Civic Square, designed by Foster + Partners and GGLO for Triad Development, was approved in 2009 but stalled during the Great Recession. Bosa Development took over in October 2016; its James K.M. Cheng-designed tower won approval of development rights in December 2019, and excavation began in 2022 before pausing that July.
The site at 3rd Avenue and Cherry Street was occupied by the Public Safety Building until its demolition in 2005; the block has stood as a vacant lot since, and the planned tower's name, 3rd & Cherry, comes from this intersection. The project's public plaza was part of the design from the 2009 Civic Square approval, when a 30,000-square-foot open space was planned alongside the tower.
The site at 3rd Avenue and Cherry Street sits beside an entrance to the Pioneer Square light rail station. Construction of the tower has been paused since July 2022, so the ground-level plaza and retail spaces described in the plans are not yet built; check current site conditions before visiting.
The site at 3rd Avenue and Cherry Street held the Public Safety Building, demolished in 2005. A 2015 lawsuit settlement obliged Triad to pay $5.5 million into a housing affordability fund if the project were built; Bosa later agreed to contribute $5.7 million to such a fund and $16 million toward the tower.