Willapa Hills State Park Trail, Rail trail in Lewis and Pacific Counties, Washington
The Willapa Hills State Park Trail is a 56-mile rail trail between Chehalis and South Bend, built on a decommissioned Northern Pacific Railway line and following State Route 6. Its grade never exceeds 2 percent. Surfaces range from pavement near Chehalis to compact gravel and unimproved stretches in Pacific County, and the route crosses 35 bridges and trestles, including the rebuilt Bridge 5 and Spooner Bridge near Adna.
The route follows a Northern Pacific Railway spur built in 1892, which carried freight and passenger trains, including a parlor car, peaking at four daily trips by 1907. The last passenger train ran on March 19, 1954, and freight service ended in 1990. Washington State Parks acquired the 757-acre corridor in 1993, and the first 7-mile section opened in 2001.
The trail passes through former railroad stops whose names survive mainly as place names, such as Millburn, Ruth and Ceres between Adna and Meskill. Near Menlo, users can stop at Willie Keil's Grave State Park Heritage Site, a burial site maintained as a heritage stop along the route.
Thick-tired bicycles work best for the gravel sections, while the paved portions suit most bikes and walking shoes. Parking at Pe Ell and Adna trailheads requires a Washington State Discover Pass.
The trail crosses 35 bridges and trestles, as recorded by 2003. In Lewis County alone it passes over the Chehalis River five times, including Bridge 5 and Spooner Bridge near Adna, and crosses the Newaukum River on the Northern Pacific Railway Newaukum River Bridge close to the Chehalis trailhead.
The community of curious travelers
AroundUs brings together thousands of curated places, local tips, and hidden gems, enriched daily by 93,792 contributors worldwide.