Huites Dam, Hydroelectric power station in Choix Municipality, Mexico
Huites Dam stretches 444 meters across the Rio Fuerte using arch-gravity concrete construction and rises 162 meters high. The facility features massive concrete structures and is equipped with two Francis turbines that work together to generate electricity for northwestern Mexico.
Construction started in 1992 and involved major excavation work to prepare the foundation structure. The facility began operating in September 1996 after the main structures were completed.
This facility carries the name Luis Donaldo Colosio and holds significance for surrounding communities as a vital source of water and power management. For local people, it represents more than infrastructure - it is a symbol of regional development and reliable energy supply.
The site can be reached by road from near Choix Municipality, with the best viewpoints accessible from elevated areas. Visitors should note that some parts of the grounds may have restrictions, so it is helpful to check access rules beforehand.
The spillway system features four radial gates that work together to manage large volumes of water with precise control. These gates are a technical feature that can impress visitors who recognize the engineering effort involved in controlling such massive flows.
The community of curious travelers
AroundUs brings together thousands of curated places, local tips, and hidden gems, enriched daily by 60,000 contributors worldwide.